Hatch provided EPCM for the mining-and-concentrator project in the state of Goiás in Brazil. The project consisted of greenfield mining development and a copper/gold concentrator plant with a
capacity of 172,000 tpa of concentrate.
More about Chapada Project >
The Chuquicamata mining complex is located 1,650 kilometers north of Chile’s capital city, Santiago, and 2,870 meters
above sea level. It includes two open pit mines, Chuquicamata and Mina Sur.
More about Chuquicamata Underground Mine Project >

Hatch was retained by CVRD to provide the engineering and construction support services to the project. The project included new technologies on copper concentrates (CESL) and high pressure leaching process.
More about CVDR UHC Project >

The scoping study undertaken by Hatch for Xstrata Copper’s Kidd metallurgical site included a critical review of existing infrastructure and operations and maintenance practices with consideration given to the limited remaining operating window at the mine and the closure/post-closure periods.
More about Tailings Optimization and Water Management Scoping Study >

This two-phase project involved the development of a 100 tpd experimental Continuous Reactor, and subsequently, a 800
tpd prototype Continuous Reactor plant for the smelting of copper concentrate.
More about Continuous Reactor Noranda Mines Ltd. >

The new facilities will convert matte from the Noranda reactor into semi-blister copper in the new Noranda converter.
The new converter is a 4.5 meter diameter vessel over 20 meters long.
More about Horne Smelter - Noranda Converter >